Reference projects
Refineries, combined-cycle plants, solar thermal plants and industrial civil works in Spain, Europe, Africa and the Americas.
- reference projects
- 40+
- across Europe, Africa and the Americas: from Cartagena to Copenhagen, Talara or Santo Domingo
- 10 countries
- solar thermal plants
- 7
- of piping prefabricated in the C-10, polymer and Valle 1 and 2 projects alone
- 355,000″+
Our team has taken part in the following projects, from workshop prefabrication to assembly, testing and commissioning.
Refining and petrochemicals
- Repsol, Cartagena — C-10 Project (hydrocracker): prefabrication of 195,000 inches of piping and fabrication of 280 steam and condensate manifolds; erection of equipment, supports, piping, building structures and racks.
- Repsol, Cartagena — Unit U-602: upgrade of the exchanger cooling system of the coker unit: prefabrication and erection of piping, supports, valves and pumps.
- Repsol, Cartagena — Units U-603, U-604 and U-632: mechanical erection of static and rotating equipment with their process piping.
- Cartagena — C-34 Project: fabrication, installation and placement of sleepers; prefabrication, erection and routing of lines.
- Galp, Portugal — Hydrocracker: prefabrication and erection of carbon steel and 316 and 321 stainless steel piping.
- Total, Antwerp (Belgium) — Optara Project: refinery modernisation: installation of equipment internals and piping routing.
- Técnicas Reunidas and Petroperú — Talara Refinery (Peru): Talara Refinery Modernisation Project (PMRT).
- BP Oil, Castellón — Coke building: fit-up and erection of the structure, fabrication of manifolds and erection of piping, supports and valves.
- Dow, Tarragona — Chemical plant expansion: erection of equipment, piping, supports and valves.
- General Electric, Cartagena — HPP Polymers: prefabrication of 85,000 inches of piping in steel, stainless, duplex, Hastelloy and AL-6XN, and erection of 850,000 kg of structures, piping and equipment at the polymer and oxidation plants.
Power
- Alstom, Cartagena — Combined cycle: prefabrication and erection of piping and supports.
- Sagunto — Combined cycle: pre-assembly, erection and alignment of three exhaust stacks.
- Alstom, Netherlands — Combined cycle: loop completion, line supervision, as-built documentation and hydrostatic testing.
- Los Mina (Santo Domingo, Dominican Republic): conversion to combined cycle.
- HOFOR BIO4 (Copenhagen, Denmark): mechanical erection package.
- Albioma Bois Rouge (Réunion, France): mechanical erection package for the DeNOx system.
- Pointe Jarry (Guadeloupe, France): piping prefabricated in Cartagena and erected on site.
Solar thermal
- Andasol (Granada): erection of equipment, piping and supports for the power island lines.
- Extresol and Sancasol (Badajoz): piping prefabrication for both phases of each plant.
- ASTE 1B (Badajoz): piping prefabrication.
- Gemasolar (Seville): piping prefabrication for the central tower plant.
- Valle 1 and Valle 2 (Cádiz): prefabrication of 75,000 inches of piping for both phases.
Mining and fertilisers
- Guelb II (Mauritania) — Usine d’Enrichissement: prefabrication and erection of 9,000 tonnes of steel structure.
- Jacobs — Jorf Lasfar (Morocco): expansion of a chemical plant producing phosphates for fertilisers (Downstream Project).
Civil works
- Repsol, Escombreras Valley — C-10 and C-29: civil works for the refinery expansion, for Repsol and with Dragados, SADYT and Carbonell y Figueras.
- Enagás, Escombreras Valley: expansion of the boil-off system.
- Iberdrola, Escombreras CCGT: maintenance and civil works, pump house refurbishment, office building refurbishment and fencing of the new plant.
- Alstom Power and AES Energía, Cartagena: maintenance and civil works at combined-cycle plants.
- Initec — New combined-cycle plant: earthworks and site development.
- Moncobra — Linasa plant and Curra Dock: maintenance and civil works; ducts, manholes and trenches for the replacement of fuel pumps and pipes and an emergency generator at the Naval Base.
- Cobra, Cartagena: civil works for low- and medium-voltage underground lines and distribution installations.
- Cartagena — Buildings and public space: Espacio Mediterráneo shopping centre and new pedestrian access to Cala Cortina.
Clients
We work with the leading companies in the industrial sector
Want this team on your project?
We will explain how we can help you on your next project.